What really changes
| Local fabrication | Overseas fabrication | |
|---|---|---|
| Site verification | Usually easier to revisit | Needs disciplined measurement before production |
| Factory scale | Varies widely | Can offer highly automated production |
| Changes | Generally easier | More costly once fabricated or shipped |
| Lead time | Usually shorter logistics chain | Must include production, packing, shipping and customs |
| Replacement | Generally faster | May require another shipment |
| Quality | Depends on system and team | Depends on system and team |
Quality is a system
When we evaluate carpentry, we look beyond the laminate sample. We look at board specification, edge treatment, hardware, drilling accuracy, door gaps, drawer alignment, internal finishes, lighting integration, packing, site protection and who is responsible for installation.
Excellent overseas factories exist. Excellent local workshops exist. Poor examples exist in both places.
When each can make sense
Local can be strong when
The site has many irregular conditions, late changes are likely, access is difficult, or the project benefits from repeated physical coordination with the workshop.
Overseas can be strong when
The design is frozen early, quantities are substantial, factory capability is strong, the packing/logistics plan is disciplined and the installer understands the system.
What an owner should compare
- Carcass and door material
- Moisture resistance appropriate to location
- Edge-banding and exposed-edge detailing
- Hardware brand and exact series
- Drawer systems and load ratings
- Internal finish, not only external finish
- Shop drawings and approval process
- Site measurement responsibility
- Installation and post-installation adjustment
- Replacement process if a panel is damaged